| Name | Access Demonstration Project - Final Report |
| Description | The three WA Access Demonstrations finalised their data collection requirements as part of the National Access project on 30th July 2009. Each Demonstration provided valuable data and an opportunity to test the Access Model in a range of different settings. A final summation report of these the three Demonstrations Projects has been prepared and is available for download. Our thanks to all the project participants and stakeholders who contributed to the success of the Demonstration Projects. |
| Filename | 2009-09 WA Access Network Demonstration Project Report Final.pdf |
| Filesize | 1.54 MB |
| Filetype | pdf (Mime Type: application/pdf) |
| Creator | helenattrill |
| Created On: |
10/01/2009 14:00 |
| Viewers | Everybody |
| Maintained by | Editor |
| Hits | 511 Hits |
| Last updated on |
10/01/2009 14:19 |
| Homepage | |
| CRC Checksum | |
| MD5 Checksum | |